Handeland Tunnel seen from east. Length 190m.
The road passes Iddeland, Tjomsland, Håland & Rørdal (Roerdal) before entering the Vatland Tunnel, the longest one on the new road.
The entrance to Vatland Tunnel. Length 3200m.
Opofte Tunnel, 130m.
Opofte, with the two-level crossroad. far behind the entrance to Teistedal Tunnel.
Teistedal Tunnel, 1950m.
From the Teistedal Tunnel, the road enter the Fedafjorden Bro.
On the bridge.
Refsti Bro seen from Refsti. Length 250m.
Birkeland Bro. Length 275m.
New 20060509 Rev. 20080224 www.mobilcrane.com |