Utskriftsvennlig side   
Menu
 Art from the future
A special transport

bilde
The bottom section on the truck from Osen Transport AS, ready to go.

bilde
One wheelset had to be transported outside the sidebeam. www.mobilcrane.com

bilde
In this picture you can see the reason for the special placing of the cranebase section.
Now the load is beeing lowered on the trailer, to encure passing through the tunnel,
with a 0,1m clearance to the tunnel-lighting rods. www.mobilcrane.com  

bilde
The truck is here beeing unloaded. Total weight of the cranebase is 13,5 ton. Notice the restricted area for the crane-mounting. www.mobilcrane.com

bilde
The Ural 375D, now with 60 meter outrigger on the transporting-frame. Exact load of outrigger is 10,7 ton. From this point, the transport will pass over the "Refsti Bro" and through the "Fedahei tunnel", aproxemately 2,5 km of travel. www.mobilcrane.com

bilde
A owerviev from the rig-area. The distance from senter of the Demag AC200-1 to the mountain, is 24 meter. When the crane did take ower the handling of the outrigger, it still had a 1/3 part inside the tunnel. www.mobilcrane.com

bilde
Lifting counterweight's to the Liebherr towercrane. www.mobilcrane.com

bilde
Seen from westside of the site. www.mobilcrane.com

bilde
From Flekkefjord Slipp & Maskinfabrikk AS's shipyard (Picture). www.mobilcrane.com

bilde
The Liebherr, complete in 60m height. www.mobilcrane.com  

Back to "Allfarveg" 
New 20051111 Rev. 20060901 www.mobilcrane.com bilde 

 
 